Lifestyle

First phase of Navi Mumbai’s Nerul-Seawoods-Uran suburban rail line commissioned

[ecis2016.org] A new suburban corridor on the Central Railway was inaugurated on November 11, 2018, linking Nerul and Belapur in Navi Mumbai with Kharkopar in Ulwe, a rapidly developing node in the satellite city

The 12-km Nerul-Seawoods Darave-Belapur-Kharkopar corridor in Navi Mumbai, was commissioned by railway minister Piyush Goyal, along with Maharashtra chief minister Devendra Fadnavis, on November 11, 2018. This is the first phase of the 27-km Nerul-Belapur-Uran corridor on the Harbour route of the Central Railway (CR) that extends suburban trains to adjoining Raigad district.

You are reading: First phase of Navi Mumbai’s Nerul-Seawoods-Uran suburban rail line commissioned

Read also : SC seeks RBI’s response on plea over banks not passing on benefits of low interest rates

Regular services on the corridor will start from November 12, 2018 and link the Ulwe node in Navi Mumbai with Chhatrapati Shivaji Maharaj Terminus (CSMT) and Panvel on the Harbour route, besides Thane on the Trans-Harbour corridor. The Ulwe node is located opposite the upcoming Navi Mumbai International Airport. This is the first suburban corridor in the Mumbai metropolitan region in 13 years and comes after the Trans-Harbour Line, connecting Thane with Navi Mumbai, was thrown open in 2005.

[ecis2016.org] Rs 65,000 crores set aside for Mumbai suburban rail revamp: Railway minister

Speaking after commissioning of the corridor at the Kharkopar railway station, Fadnavis said in the modern era transportation and mobility play a key role in human settlement. “In earlier days of civilisation, people would settle near rivers, where they could easily get water. Now, people start habitation at places which are equipped with means of transportation and mobility,” he said. Fadnavis said large-scale investments are being made in Mumbai’s suburban railway network, to enhance connectivity and improve passenger amenities. “We are also investing Rs one lakh crore in various metro projects that will also be integrated with suburban networks,” the chief minister said.

Read also : Maharashtra government proposes changes, to regularise illegal buildings

The Seawoods-Belapur-Uran line was conceived in the late 1990s, to augment the Harbour rail network. The commissioning of the new rail corridor was to take place in December 2017 but it got delayed by nearly a year. The CR will operate 40 services daily from November 12, of which 20 will run between Kharkopar and Nerul and the rest between Belapur and Kharkopar stations.

The 27-km-long project is coming up at a cost of Rs 1,782 crores. The second phase, on which work is currently going on, will stretch from Kharkopar to Uran, a coastal town in Raigad district. “Once fully functional, the entire corridor will benefit the Navi Mumbai Airport, Jawaharlal Nehru Port Trust container port at Nhava Sheva and fishing communities in the region and also connect Panvel, Pen, Roha and CSMT,” said an official of state-run town planning agency, CIDCO. The project cost is being shared by the Railways and CIDCO in the ratio of 33:67 per cent.

Source: https://ecis2016.org/.
Copyright belongs to: ecis2016.org

Source: https://ecis2016.org
Category: Lifestyle

Debora Berti

Università degli Studi di Firenze, IT

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button