Lifestyle

Trail run of Mumbai Metro 3 begins

[ecis2016.org] Trial run of the Aqua Line, also known as the Colaba-Bandra-SEEPZ Metro Line-3 was flagged off at Sariput Nagar in Aarey Colony

Trial run of the Aqua Line, also known as the Colaba-Bandra-SEEPZ Mumbai Metro Line 3 was flagged off at Sariput Nagar in Aarey Colony by Maharashtra chief minister Eknath Shinde and deputy chief minister Devendra Fadnavis. The trail run began around 11 am and they both inspected the Metro before giving the green signal.

You are reading: Trail run of Mumbai Metro 3 begins

Designed and Manufactured by Alstom India the Metro train will complete 10,000 km run on 3 km rail track completed from Sariput Nagar to MarolNaka, mentioned the Mumbai Metro 3 tweet. Metro Line 3 is funded by Japan International Cooperation Agency (JICA).

Read also : Increase in ready reckoner rates in Maharashtra; cost of buying up marginally

Mumbai Metro 3 trail run

Source: Mumbai Metro 3 Twitter

“We are committed towards completing the 1st phase by Dec 2023. We are happy the way the project has picked up pace,” said Shinde.  The second phase is expected to be operational 6 months after the first phase.

Added Fadnavis, “Nearly 17 lakh people will travel daily on this line once it is operational. With the commencement of this line, nearly seven lakh vehicles will go off road. It will definitely support the environmental cause. We are satisfied with the progress of the project and glad it’s in able hands.”

Read also : A guide to paying Coimbatore property tax payment

Metro line 3 is a 33.5 km underground route that will connect south Mumbai with the western suburbs, thereby reducing the burden on the Mumbai suburban trains. The trial run marks an important development in the realisation of the Metro line 3 track that is shrouded in controversy. The construction of Metro car shed at Aarey, a forested land adjoining the Sanjay Gandhi National Park, was reversed by the present government. With the car shed now being constructed at Aarey, the investment made for the car shed will not go waste. Presently, the Supreme Court has issued a directive to MMRCL on following the undertaking on no-cutting of trees at the Aarey colony.

Presently, as part of Mumbai Metro, Mumbai Metro Line 1 and phase 1 of Lines 2A and 7 are operational with the trail runs of phase 2 of Lines 2A and 7 to kick off from October 2022. The second phase of the 2A and 7 Mumbai metro lines are expected to start by December 2022 end.

Finally, at the flagging off event, the chief minister also mentioned that the first phase of Mumbai Nagpur Expressway also known as Samruddhi Mahamarg between Shirdi and Nagpur will be inaugurated soon.

Source: https://ecis2016.org/.
Copyright belongs to: ecis2016.org

Source: https://ecis2016.org
Category: Lifestyle

Debora Berti

Università degli Studi di Firenze, IT

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button