[ecis2016.org]
In a major move to improve the transport network in Mumbai, the Maharashtra government has announced a number of metro lines in the city linking major industrial and commercial hubs in and around the metropolis.
You are reading: All you need to know about the Mumbai Metro corridors
While the Mumbai Metropolitan Region Development Authority (MMRDA), the nodal agency for the development of the metro network in the megapolis, had finalised the construction plan of a 24-km Thane-Bhiwandi-Kalyan Metro-5 corridor and 14.5-km Swami Samarth Nagar-Jogeshwari-Kanjurmarg-Vikhroli Metro-6 corridor, Mumbai Metro Line 10, 11, 12 are also under construction. Moreover, Mumbai Metro 2A line construction work is also finished. Here is all you need to know about Mumbai Metro connectivity.
Mumbai Metro Line 2
Mumbai Metro Line 2 is a 42-km stretch and will have two sub-sections – 2A and 2B. The 2A section will be an 18-km corridor between Dahisar-Charkop-DN Nagar and will have 17 stations. The 2B section is between DN Nagar-BKC-Mankhurd and will cover a route of 23.5 kms. The estimated cost for this project is around Rs 17,000 crores. It will be funded by the state and central governments, along with loans from the Asian Development Bank and the World Bank.
The route will have six-coach driver-less trains, which will be big enough to carry 1,800 commuters. The daily ridership is expected to touch eight lakhs within a year. While the work on the last phase is now finished, the trial runs on Line 2A was supposed to start in January 2021 but as per Mumbai Metro officials, due to the lockdown and lack of manpower, there will be a delay in completing the construction works, conducting trials, as well as operations, which were expected to start in May 2021. The authority is yet to announce the new deadline.
Stations on Line 2A | Stations on Line 2B |
Dahisar | ESIC Nagar |
Anand Nagar | Prem Nagar |
Rushi Sankul | Indira Nagar |
IC Colony | Nanavati Hospital |
Eksar | Khira Nagar |
Don Bosco | Saraswat Nagar |
Shimpoli | National College |
Mahavir Nagar | Bandra Metro |
Kamraj Nagar | ITO BKC |
Charkop | IL&FS, BKC |
Malad Metro | MTNL, BKC |
Kasturi Park | SG Barve Marg |
Bangur Nagar | Kurla East |
Goregaon Metro | Eastern Express Highway |
Adarsh Nagar | Chembur |
Shastri Nagar | Diamond Garden |
DN Nagar | Shivaji Chowk |
BSNL | |
Mankhurd | |
Mandala |
Mumbai Metro Line 5
The 24-km-long and Rs 8,416-crore Thane-Bhiwandi-Kalyan Metro-5 corridor, will be completely elevated and have 17 stations. The 17 proposed stations on this corridor are-
Kalyan APMC |
Kalyan station |
Sahajanand Chowk |
Durgadi Fort |
Kon Gaon |
Gove Gaon MIDC |
Rajnouli village |
Temghar |
Gopal Nagar |
Bhiwandi |
Dhamankar Naka |
Anjur Phata |
Purna |
Kalher |
Kasheli |
Balkumbh Naka |
Read also : Court grants 3-month interim bail to Unitech promoters
The project is expected to be completed within 41 months (by 2021) and the frequency of metro trains on the route will be one train every five minutes, the release said. Each train running on the corridor, is expected to clock daily ridership of around 2.29 lakhs by 2021. The initial minimum fare on the route will be Rs 10 and maximum Rs 50. The project will be implemented by the MMRDA. The Metro-5 corridor will eventually connect with the Metro-4 line of Wadala-Thane-Kasarwadavli and Metro-11 corridor between Taloja and Kalyan.
Mumbai Metro Line 6
The sixth metro line, which will link the western suburbs with their eastern counterparts, will be the second west-east metro corridor, after the already operational Versova-Andheri-Ghatkopar section, it added. The 14.5-km-long Metro-6 corridor, is expected to cost Rs 6,672 crore and will have 13 stations. These stations are:
Swami Samarth Nagar |
Adarsh Nagar |
Momin Nagar |
JVLR |
Shyam Nagar |
Maha Kali Caves |
SEEPZ village |
Saki Vihar Road |
Ram Baug |
Powai Lake |
IIT Powai |
Kanjurmarg West |
Vikhroli |
The much needed west-east corridor will link the hitherto not connected areas like JVLR, SEEPZ, Saki Vihar Road, Powai Lake, IIT Powai and Kanjurmarg. Besides this, the Metro-6 corridor will connect SV Road, Western Express Highway, Jogeshwari-Vikhroli Link Road, LBS Marg and Eastern Express Highway. The Metro-6 corridor earlier was planned to link Jogeshwari-Vikhroli to Kanjurmarg. However, it was extended in the west to Swami Samarth Nagar, linking Metro-2 corridor and the entire western suburbs. The 18.6-km Metro 2-A route is between Dahisar east and DN Nagar in Andheri east. By linking this corridor with Metro-6, the entire corridor length becomes 33 kms. The route will have its car depot at Kanjurmarg.
Out of the total Rs 6,716 crores project cost for Metro-6, MMRDA’s share is Rs 3,195 crores and the state government will contribute Rs 1,820 crores. The remaining, Rs 1,700 crores, will be a loan component. The Metro-6 corridor will be linked with the Western and Central Railways’ suburban network, Metro 2-A (Dahisar-DN Nagar), Metro-7 (Dahisar-Andheri), Metro-4 (Wadala-Thane-Kasarwadavli) and Metro-3 (Colaba-Bandra-SEEPZ) corridors, thus, creating the longest metro corridor in the Mumbai Metropolitan Region (MMR). The initial minimum fare on the Metro 6 route will be Rs 10 and maximum at Rs 30.
Mumbai Metro Line 7
Mumbai Metro Line 7 is a 33.5-km-long section that will connect Dahisar with Andheri and further to the Mumbai International Airport. The route will have 29 stations, out of which 14 will be elevated and the remaining will be underground. At present, only 16 stations have been approved. The construction was started in August 2016 at an expense of Rs 6,208 crores and operations were expected to start in mid-2020. However, due to the Coronavirus pandemic and the subsequent lockdown, the project is not yet complete. The Asian Development Bank is providing partial funding for the project.
Dahisar East | Vitt Bhatti Junction |
Shrinath Nagar | Aarey Road Junction |
Borivali Omkareshwar | V Nagar |
Magathane Bus Depot (Borivali) | Hub Mall |
Thakur Complex | Mahanand Bombay Exhibition |
Mahindra &Mahindra | JVLR Junction |
Bandongri | Shankarwadi |
Kurar Village | Andheri East |
Mumbai Metro Line 9
As per the proposal, Metro-9 will be integrated with Metro-7 (Dahisar to Andheri) and Metro-2A (Dahisar to DN Road) along with the proposed Rs 3,600-crore Gaimukh-Shivaji Chowk (Mira Road or Metro-10). The tendering process to appoint general consultants and contractors for civil works for Metro-9 is in progress and is expected to commence from March 2019. Currently, the north-western suburbs of Mira-Bhayander are connected to Mumbai via the suburban railway line.
At present, work on several metro corridors is underway across the megapolis, including the Dahisar-DN Nagar (Metro-2A), DN Nagar-Mankhurd (Metro-2B), Andheri east-Dahisar (Metro-7), Colaba-Bandra-Seepz (Metro-3), the elevated Wadala-Kasarvadavali (Metro 4) and the Swami Samarth Nagar-Jogeshwari-Vikhroli (Metro-6).
Mumbai Metro Line 10, 11, 12
Read also : What are penthouses and how popular are they in India?
Prime minister Narendra Modi, had laid the foundation stones for three Metro Lines – 10, 11, and 12 in September 2019, that will serve the city and also the MMR. While the 9.2-km long Gaimukh to Shivaji Chowk (Mira Road) Metro-10 corridor and 20.7-km long Kalyan to Taloja Metro-12 corridor will serve the region; the 12.8-km long Wadala to Chhatrapati Shivaji Maharaj Terminus Metro-11 corridor, will be for commuters travelling to South Mumbai from the central suburb Wadala.
It can be noted that the financial capital is catching up with the national capital after decades, in modern public transport and is pumping in over Rs 1.2 lakh crores to build 14 metro corridors stretching 337-km over the next decade.
Mumbai Metro Latest News
Mumbai Metro 5: Villagers oppose MMRDA move to acquire their land
The Thane-Bhiwandi-Kalyan Metro Line 5 project may hit a roadblock, as over 100 families have opposed the proposal to construct a car-shed on their land at Govegaon, near the Kalyan-Bhiwandi Road in Maharashtra. The villagers said they did not want to lose their land to make way for a car-shed, as it was their only source of livelihood.
- Pimpri Chinchwad Municipal Corporation (PCMC): Everything you always wanted to know
- Unauthorised construction: HC seeks details of all properties under MCD jurisdiction
- SDMC extends ambit of property tax amnesty scheme to all colonies
- Student housing: Indian real estate’s next big segment in 2019?
- Property tax Puducherry: All you need to know about paying Pondicherry property tax
“The Mumbai Metropolitan Region Development Authority (MMRDA) wants to acquire around 36 hectares of our land in Govegaon, for a metro car-shed. The move will affect as many as 100 families,” secretary of Kon-Gove Sangharh Samiti, Pandharinath Bhoir, said, in a press conference, on October 11, 2019. “We are not against the metro project. We just want the MMRDA to use government land, instead. We are not ready to give our land, as we will lose our livelihood,” said Bhoir, adding that the compensation offered by the development authority was less than the market value. Neeta Mahajan, a lawyer, who represents the committee, said, “The villagers have their houses, shops and small-scale workshops on this land.”
The MMRDA had, in 2018, sent notices to the residents, stating that it wanted to acquire the land for the car-shed. The Metro Line 5 is likely to benefit over 2.9 lakh people, as it will cut the travel time between Thane and Kalyan.
Source: https://ecis2016.org/.
Copyright belongs to: ecis2016.org
Source: https://ecis2016.org
Category: Lifestyle